EW Construction


Elmwood Construction Project


Keeping the Elmwood Park Community Informed of Our School's Renovations and Upgrades


On May 11, 2022, the Elmwood Elementary School construction project kicked off with a groundbreaking ceremony. The event featured guest speakers, student singers and contest winners, refreshments and even some swag!

For photos of the event, click here. For video coverage and a wrap-up article, click here.

Thank you to everyone who joined us for the celebration, and thank you to all Elmwood Park residents who made it possible for us to take our next step in District 401's vision for building a brighter future for our students, families and community.

Building a Brighter Future

 


Elmwood Groundbreaking Ceremony


Elmwood groundbreaking

PHOTOS: Above, members of the District 401 Board of Education, along with our Superintendent of Schools and Elmwood's building leaders, participate in the ceremonial groundbreaking at Elmwood Elementary School on May 11, 2022. Below, Elmwood students perform their school song under the direction of music teacher Meredith Olson. Click the student photo to see and hear them perform! For more photos, visit these galleries. (Top photo by Alex Romanovsky, DLA Architects; bottom photo by Dave Porreca, District 401)

Elmwood students sign their school song


Construction Timeline



Renderings of the New Elmwood



Project Overview


During the next two years, work will be conducted to upgrade Elmwood by meeting the following needs:

MECHANICAL NEEDS

  • Replace boilers and unit ventilators
  • Repair or replace the HVAC distribution system
  • Repair or replace air conditioning equipment

PLUMBING NEEDS

  • Replace galvanized piping
  • Repair pipes, drains, related equipment where needed
  • Replace water heaters
EW Hardhat logo

ELECTRICAL NEEDS

  • Upgrade circuit breakers and electrical panels and related wiring and equipment
  • Replace or provide wiring throughout the building
  • Replace interior and exterior lighting

ADDITIONAL LIFE SAFETY & LEARNING ENVIRONMENT NEEDS

  • Replace windows, repair roofs and conduct tuckpointing around the entire exterior
  • Replace doors, including door frames and locks
  • Replace security camera, door alarm and public address systems
  • Renovate interior spaces to modernize the learning environment

Foundation work began outside the building on March 28, 2022, with completion of the entire project scheduled for August 2024.

Handling the project will be DLA Architects, Ltd., and International Contractors, Inc., the same firms responsible for the recent renovation and expansion of Elm Middle School.


What a New Elmwood Will Look Like



Project Floor Plans


EW Floor Plans

ABOVE: Floor plan for first floor of Elmwood (click image for larger view).


EW Floor Plans

ABOVE: Floor plan for second floor of Elmwood (click image for larger view).


CONSTRUCTION NEWS & UPDATES